Proposed Construction Project on Crystal Beach Drive, Bedale Drive, Conniston Avenue, Ullswater Drive, Hexham Road and Whitburn Crescent

Dear Resident,

Beginning July 2016, the City of Ottawa will begin construction work in your neighbourhood. This work is being conducted to upgrade the sanitary sewer in your community.

WHO:              The Contractor Taggart Construction Ltd. will be performing the construction work for the City of Ottawa.

WHY:               The purpose of this project is to provide sanitary sewer upgrades within the project limits as a flood mitigation measure.  As an additional benefit of the work, services, roads, and sidewalks will be renewed and a new sidewalk installed on the west side of Crystal Beach Drive.

WHAT:            The construction work will involve the reconstruction of the sanitary sewer. There will also be some sections of sidewalk, storm sewer and watermain that are impacted due to the sanitary sewer replacement excavations which will be replaced.  A new concrete sidewalk is to be constructed on the west side of Crystal Beach Dr. from Ullswater Dr. to Carling Ave. House services will be reinstated up to the property line.  The Work will also include the reconstruction of Hexham Rd. and Whitburn Cres. and sewer trench reinstatement on all other roads.

WHEN:            This work is planned to begin in July of 2016. The majority of the underground work is expected to be completed by the end September of 2017 with some final asphalt surface placement in 2018 for locations where the roadworks were completed in 2017.

The City of Ottawa Noise By-law (2004-253) allows construction activity to occur weekdays between 7am and 10pm. On Saturdays, work is permitted between 7am and 10pm while Sunday and Statutory holiday work is allowed between 9am and 10pm.  Contractor’s usual construction hours are weekdays from 7am to 7pm.  This will be modified as needed, for example if weather affects the schedule, or if conditions change. Please check the City website for updates to the Crystal Beach Drive / Bedale Drive / Conniston Avenue / Ullswater Drive / Hexham Road / Whitburn Crescent sewer construction project.

WHERE:        Construction will take place on the following streets:

  • Crystal Beach Dr. (North of Carling to Ullswater)
  • Bedale Dr. (North of Carling to Crystal Beach)
  • Conniston Ave. (Crystal Beach to Gaynor)
  • Ullswater Dr. (Crystal Beach to Roche)
  • Hexham Rd.(Stillwater to Whitburn), and
  • Whitburn Cres. (From Hexham to +/- 100m East)

 

A key plan of the work area is below. Every effort is being made to reduce the duration of the construction impacts

Accessibility

Accessibility is an important consideration for the City of Ottawa. The City makes every effort to provide access through and around construction sites. If you require special accommodation, please contact the On-Site Inspector or the Contractor’s Representative noted below.

On-Street Parking & Traffic

Full road closures of Crystal Beach Drive, Bedale Drive, Conniston Avenue, Ullswater Drive, Hexham Road and Whitburn Crescent will be required, although access for local traffic will be maintained.  The Contractor is required to ensure that homeowners have access to their properties. In the event that access to your driveway is restricted due to construction activities, a temporary On Street Parking Permit (orange form) will be issued by the on-site Inspector to authorize on street parking within a few blocks of your residence.

Carling Avenue will remain open to traffic throughout the project, however periodic lane reductions will be required to accommodate construction.

Public Transit (OC Transpo)

Transit service route 152 on Crystal Beach Drive will be temporarily detoured via Ullswater Drive to accommodate construction. Additional information will be posted on the OC Transpo website when it becomes available. Please visit OCtranspo.com for more information.

Construction Disruptions

Taggart Construction Ltd.  is assuming full responsibility for the construction work until it is entirely completed. They will take every precaution to minimize interruptions to the everyday life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during the course of the operation of the work, such as delays and traffic detours when travelling through the construction zone, noise, dust and vibration.  We would like to thank you for your patience and co-operation.

Impact on the Right-of-Way and Adjacent Private Properties

The road and sewer construction is within the City’s right-of-way but may result in some disruption to part of the private property directly adjacent to the work. Lawns, pathways, gardens and/or driveways may be disturbed. The affected areas will be reinstated as soon as possible after construction is completed, at no cost to you. However, if you have plants or any other assets located within the City’s right-of-way that you want to preserve, we suggest that you may care to move the plants in preparation for the construction work.

You may feel vibrations at your home or business due to the use of the heavy equipment needed to complete this work. This is quite common and not usually a problem.

Pre-Construction Survey

Taggart Construction Ltd. is assuming full responsibility for the construction work until the construction project is entirely completed.

The Contractor is also required by the City to carry liability insurance before any work may proceed. You may be asked by the contractor’s insurance agent for permission to survey your property before the work commences, as Contractors typically conduct pre-construction inspections to document existing conditions for their own purposes. It is to your benefit to allow the inspection to be conducted on your property, as it may assist with establishing the impact, if any, that construction has had at your property after work is complete. In addition, you may wish to complete your own survey of pre-construction conditions on your property. Your survey should include photographs.

Private Water Services

One element of the construction project will include the replacement of the small water pipe that supplies water to your property, known as the “water service.”  The water service extends from the watermain to your building. Part of the water service is located within the City’s property and part of the water service is located on your private property. This construction project will replace that part of the water service that is located on the City-owned property.  The City will only replace the City-owned portion of the water service between the watermain and your front property line. This will be done at no cost to you.  The private section of the water service (on your property) between the front property line and your building is known as the private water service. The private water service will not be replaced as part of the City project.

If your house/building was built prior to 1958, there is a possibility that your private water service may have been constructed using lead pipe (modern pipes are copper or HDPE). There is information available on the City’s website Ottawa.ca regarding lead in drinking water, how to determine if you have lead plumbing pipes and the City’s Lead Pipe replacement Program.

If you decide to replace your private water service because of existing lead pipe or simply preventive maintenance due to the pipe’s age, there are a few options available for you to consider.  In all cases, you as the property owner are responsible for the cost of this replacement as you own the pipe located on your property. 

Option 1

You may choose to do the work yourself by hiring your own contractor.  The only constraint is that you may not carry out your work while the City is working on the street and replacing your water service up to your property line. Concurrent work on your adjacent land may create a safety hazard for the City’s contractor and/or for your contractor. Once the City’s work is complete, you may replace your private water service at any time thereafter.

Option 2

The City does have a Lead Pipe Replacement Program where the City carries out the replacement on behalf of the property owner; however, it is not set up to work with any concurrent City road, sewer or watermain construction. The program covers the replacement of both the private water service and the City-owned portion of the water service when no other City construction is planned.  Since, as part of the current City project, the water service will be replaced up to your front property line, the Lead Pipe Replacement Program will only be available to you up to 2 years after the completion of the planned construction work. Under the Lead Pipe Replacement Program the City cannot replace the private water service until the construction work is completed for the same safety reasons described in Option 1.  Please note that you are responsible for all costs under this program.  Please contact the Water and Wastewater Services Customer Information at 3-1-1 (TTY: 613-580-2401) ext. 22300 if you have further questions about the Program. 

Lawn Irrigation Systems

If you own a subsurface lawn irrigation system, please notify the City’s Project Manager identified below.

Fire Supply Interruption

In addition, during construction, water will be supplied to buildings by temporary water lines. Municipal fire suppression will continue during this temporary period. Please note that private home/building fire suppression systems could be impacted as temporary water is being provided for domestic consumption purposes only. If you have a home/building fire suppression system, you are recommended to make arrangements with a fire protection services company in order to determine the extent of any impact. For information on minimizing your fire risk contact the City’s Fire Services at (613) 580-2424 ext. 15372 (West). We apologize in advance for any disruptions in water service during construction. Any problems with the temporary water services can be directed to our on-site construction inspector, or call the City of Ottawa at 3-1-1.

Contact Information

To obtain any additional information on this project, please contact the City’s Project Manager:

City’s Project Manager                                                        On-Site Inspector

Carolyn Newcombe, P.Eng.                                                   Ken LaRose

Senior Project Manager                                                         Senior Inspector

Design and Construction Municipal West                            Stantec Consulting Ltd.

Infrastructure Services Department                                      Tel: 613-769-1587

100 Constellation Drive                                                         kb.larose@gmail.com

Ottawa, ON K2G 5J9

carolyn.newcombe@ottawa.ca;

Tel: 613 580-2424, Ext. 28230 

Contractor’s Representative

Michel Noel 

Project Engineer 

Taggart Construction Limited

Office: 613-521-3000 Ext: 228  

Cell: 613-791-2942 

Fax: 613-526-5909

3187 Albion Road South Ottawa, Ontario, K1V 8Y3

mnoel@taggartconstruction.com

www.taggartconstruction.com 

Accessible formats and communication supports are available, upon request, at the following link:  www.ottawa.ca/accessibleformat.